Naveen Gayashan Wellappili

Production Engineer, Mechanical Engineer, Manufacturing Engineer, Project Engineer, Mechatronics Engineer
децембар 2, 1994

About Candidate

Dear Sir/ Madam,

I am writing to apply for an Engineer vacancy at your company. I graduated from the University of Peradeniya in the Faculty of Engineering, specializing in Production Engineering from the Manufacturing and Industrial Engineering department. I am keen on employing my skills and enthusiasm as part of your team, below I attached my CV, and look forward to discussing this position with you.

Thank you,
Best Regard,
N. G. Wellappili

Passport Nationality
Шри Ланка
Passport No
N9643144
Passport Issued Date
јун 30, 2022
Passport Expiry Date
јун 30, 2032
Passport Port Place of Issue
Colombo
Passport Photo
1st Dose Name
Sinopharm (1st Dose)
1st Dose Date
септембар 7, 2021
2nd Dose Name
Sinopharm (2nd Dose)
2nd Dose Date
октобар 25, 2021
Country
Шри Ланка
Licence No
B2311420
Driving License Issued Country
Шри Ланка
Driving License Issue Date
мај 26, 2022
Driving License Expiry Date
мај 26, 2028

Location

Work & Experience

P
Project Engineer 2021/02/05 - 2022/10/10
Dockyard General Engineering Service (Pvt) Ltd

Started on the 05th of February 2021 Currently, work here as a Project Engineer in Heavy Engineering Projects • Start 3th of April-Water supply system improvement and energy-saving project at Ambatale Water Supply and Drainage Board (Design by AutoCAD, Solidworks) • (9th of December, 2021 to 1st of April, 2022) Sandblasting and Painting of interior surface of Penstock No.2 from Power House to Valve House of Canyon Power Station in Laxapana Complex • (9th of December, 2021 to 1st of April, 2022) Sandblasting & Painting of Internal Surface of Steel Liners inside the Headrace Tunnel at Dam area, Main tunnel, Surge chamber area of Canyon Power Station in Laxapana Complex • (7th of September to 29th of October) Sandblasting & Painting of Interior surface of Penstock No.2 at Victoria Power Station • (10th of June 2021- 2nd of September) Repair work of unit #1 Flue Gas Desulfurization Duct of Lakvijaya power plant, Norochcholai • (5th of February 2021 - 09th of June 2021) Sand Blasting and Painting of Spillway gates and related Structures of Kukuleganga Power Station

Be the first to review “Naveen Gayashan Wellappili”