
Sarangu Hewage Nuwan Chamara
About Candidate
Dear Sir /Madam,
I enclosed my CV for your Reference. I have four & half years of extensive work experience with a six month training period in the HVAC field with the ability to work with many different types of people. I believe I could fit into your team.
I am a conscientious person who works hard and pays attention to my duty. I’m flexible, quick to pick up new skills, and eager to learn from others. I also have lots of ideas and enthusiasm. I’m keen to work for the leading Company with a great reputation and high profile.
I have excellent references and would be delighted to discuss the post of HVAC Enginner,QA/QC Engineer,Senior Supervisor or Supervisor with you at your convenience.
Best Regards,
S.H.Nuwan Chamara
Passport Nationality
Passport No
Passport Issued Date
Passport Expiry Date
Passport Port Place of Issue
Passport Photo
1st Dose Name
1st Dose Date
2nd Dose Name
2nd Dose Date
3rd Dose Name
3rd Dose Date
Country
Location
Work & Experience
◼ Supervised installation of different types of mechanical equipment, keeping work in line with drawings and specifications. ◼ Designed the duct & pipe system. ◼ Handled the document such as RFI, RFA & Inspection. ◼ Supervised installation of Air terminals, pipes, GI & Pre insulated duct
◼ Calculated materials and labor required to complete jobs on schedule and prepared estimates. ◼ Coordinated with MEP and civil engineers and executed site clearance to start the relevant Activities. ◼ Conducted testing inspections such as light testing for ducts and pressure testing for VRV system & pond testing for condensate drain system.
◼ VRV system implementation done including document handling, installing & testing of air conditioning equipment ◼ Executed with architects, consultants, engineers, and customers to efficiently resolve planning and construction issues.
◼ Worked as a project engineer taking on all responsibilities ◼ After Reviewing design,B.O.Q. and specifications, discussed with project manager and clients on courses of action to remedy issues for staying under budget and sticking to timelines ◼ Prepared Material BOQ, Method statements, Material application and Proper management of materials shop drawings of HVAC systems for consultant approval ◼ Calculated mathematical formulae to develop and design detailed specifications for VRV system with computer assistance. ◼ Preparation of final Test Reports, as-built drawings, Operation & Maintenance manual, and handing over the project to the client. ◼ Maintained all daily scope and MVAC inspections and tests required t o meet the construction quality established in the plans and specifications
◼ Prepared relevant documents to conduct the inspection for completed installation activities, raise RFI to QC-Inspector, method statement, check list.